Machine matching

•  Before diving electric indicator leaving out factory, the cable should be matched according to water indication regulation.

•  To supply the matched ascending pipe and start control box in accordance with contract.

•  To supply the following installing tools and material along with the machine set:

•  2 clamp plates for installation

•  Self adhesive rubber tape and plastic adhesive tape

•  Flange and flange cushion of connection bolt and nut joint for whole set of pipeline.

•  The following technical documents are enclosed:

(1) Qualified certificate of product quality inspection 1 copy

(2) Packing list 1 copy

(3) Installation and instruction manual 1 copy (enclosed: Sketch of installation and operation)